PERMANENT INSTALLATION

  • Title:The Inherited Thrine
  • Artist: ZT Tosha
  • Year: 2026

REFERENCE DIMENSIONS

  • Total Height: 240 cm
  • Crown Width: 400 cm
  • Crown Thickness: 45 cm
  • Leg Height: 195 cm
  • Leg Width: 120 cm
  • Total Length: 600 cm
  • Total Width: 300 cm

VIEWS

FROG PERSPECTIVE — SIDE — BIRD’S EYE — FRONT

FROG PERSPECTIVE

Schematic crown width 400 cm, spider legs

SIDE VIEW

Side elevation – total length 600 cm, height 240 cm

BIRD’S EYE VIEW (ZENIT)

Top view – 600 cm length x 300 cm width, crown centered

FRONT VIEW

Front view – crown width 400 cm, total width 300 cm


CONSTRUCTION DETAILS

1. MODULE BREAKDOWN (12 MODULES)

  • C1 – C2: Crown Center Left / Right
  • C3 – C4: Crown Left / Right Overhang
  • S1 – S4: Spider Body (Front Left, Front Right, Rear Left, Rear Right)
  • L1 – L4: Leg Assemblies (Front Left, Front Right, Rear Left, Rear Right)

2. MATERIALS

  • Frame Primary: Aluminum 6061-T6, 80 x 80 x 6 mm
  • Frame Secondary: Aluminum 6061-T6, 60 x 60 x 5 mm
  • Leg Reinforcement: Steel S235, 60 x 60 x 5 mm, galvanized
  • Shell: FRP composite, 6-10 mm
  • Fasteners: 316 stainless steel bolts (M10, M12, M16)
  • Finish: Matte black RAL 9005, UV-resistant

3. CONNECTIONS

  • Type: Hidden internal flange system
  • Bolt visibility: Invisible from exterior
  • Shadow gap: 3-5 mm between modules
  • Access hatches: Underside for maintenance
  • Total bolts: 180-220

FLANGE CONNECTION DETAIL

Hidden internal flange – shadow gap 3-5 mm, invisible bolts

4. FLOOR CONNECTION

  • Contact points: 4 legs (L1, L2, L3, L4)
  • Indoor: Ballasted steel base plates (500 x 500 x 12 mm) with weights
  • Outdoor: Embedded M16 anchor bolts (8 bolts total, 80 Nm torque)

GALLERY INSTALLATION GUIDE

1. PREPARATION (Day 0, 2 hours)

  • Clear gallery space to minimum 7 m x 5 m
  • Protect floor with ram board or plywood
  • Verify ceiling height minimum 3.5 m
  • Set up stepladders or small scaffolding for crown installation

2. POSITIONING

  • Unpack all 12 crates
  • Position floor anchoring system (4 points)
  • Align with gallery axes

3. ASSEMBLY SEQUENCE (3 days)

  • Day 1: Install legs (L1, L2, L3, L4) and spider lower (S1, S2, S3, S4)
  • Day 2: Install spider upper connections and crown (C1, C2, C3, C4)
  • Day 3: Final floor connection, alignment, and closure

4. ANCHORING

  • Indoor: Secure each leg using ratchet straps to ballasted base plates
  • Outdoor: Secure each leg using M16 anchor bolts (2 per leg)
  • Stability test: Lateral push test at 50 kg force

5. FINAL CHECK

  • Check all shadow gaps (3-5 mm)
  • Verify crown alignment (400 cm width, centered)
  • Ensure no contact with walls
  • Close all access hatches

IMPORTANT NOTES

  • The sculpture is permanent. No inflation required.
  • No blower, no air tube, no emergency deflation procedures.
  • Suitable for indoor and outdoor installations.
  • Annual inspection required for outdoor versions.

SPECIFICATIONS

Property Value
Overall Size 600 x 300 x 240 cm
Crown Width 400 cm
Crown Thickness 45 cm
Weight 540-780 kg
Modules 12 rigid modules
Total Bolts 180-220
Frame Aluminum 80x80x6 mm + 60x60x5 mm + Steel leg reinforcement
Shell FRP composite 6-10 mm
Finish Matte black RAL 9005
Installation Time 3 days (16 hours)
Disassembly Time 3-4 hours
Lifespan Indoor 20-50 years
Lifespan Outdoor 10-20 years (with maintenance)

ANCHORING DETAIL (OUTDOOR)

  • Leg Contact Point (L1, L2, L3, or L4)
  • M16 Anchor Bolt (2 per leg, 8 total)
  • Concrete Footing (600 x 600 x 600 mm)
  • Lock Nut (80 Nm torque)
  • Protective Cap

Outdoor anchoring – M16 bolt into concrete footing, torque 80 Nm

FLOOR CONNECTION (INDOOR)

  • Leg Contact Point (L1, L2, L3, or L4)
  • Steel Base Plate (500 x 500 x 12 mm)
  • Rubber Mat (5 mm)
  • Weight Plates (20 kg each, 3-5 per leg)
  • Ratchet Strap

Indoor ballast – steel base plate + weight plates + ratchet strap